Management of the geotechnical study and injections to stabilize the subsoil.
Review and validation of all engineering drawings, in particular the optimization of material connections between the old and the new lines in order to ensure great flexibility and complementarity of all production lines.
Management of technical coordination meetings with the client, suppliers and contractors.
Supervision of the manufacture of the plate works in workshops in China by CESA supervisors.
Monitoring of civil engineering works, erection of metal structures and equipment.
Assistance with the start-up of equipment.
Supervision of performance tests and validation of certificates.
Assistance to the customer for the resolution of the punch list and satisfaction of the guarantees.
Validation of final acceptance.
Construction of a 60 MW power plant to supply the third clinker production line of 6,000 t / d of clinker and 3 million tons of cement per year.
Feasibility study and call for tender for a third clinker production line of 6,000 t / d of clinker and 3 million tons of cement per year.
Critical study of the design, engineering and construction of the entire grinding station built in 2018 by a company from Forida, USA.
Technical audit of the grinding plant of Dakhla Amenagement SA in Dkhla with a capacity of 100,000 t / a of CPJ 45 quality cement according to the Moroccan standard.
Study and implementation of a 250 t/h dust-free transport between the out-let of the crusher and the feed to the classifier.
Greenfield cement plant with 3,600 tpd clinker capacity and 1.4 mio tpy cement production.
Cement plant 3,200 tpd: EPC project, design review, contract management, construction, erection supervision and commissioning.
Cement plant 6,000 tpd : EPC project, design review, contract management, construction, erection supervision and commissioning.
Cement plant 2 x 6,000 tpd : Multi-package project, full engineering responsibility, contract management, construction, erection supervision and commissioning.
Design review and project monitoring on behalf of the lender EBRD.
Design review and project monitoring on behalf of the lender EBRD.
Feasibility study for new cement plant in Cross River state including own power plant.
Raw material investigation for new cement plant.
Call for tender for new cement plant in Ogun state including own power plant.
Feasibility Study and call for tender and supervision of execution for cement grinding plant at Mambong.
Design review and project monitoring on behalf of the lenders (banks).
Feasibility Study.
Power Plant 30 /40 MW Full engineering responsibility, i.e. feasibility study, engineering, call for tender, contract, erection and commissioning supervision.
Engineering review and erection supervision of main crusher installation.
Feasibility Study.
Engineering review and erection supervision of bulk loading installation.
Design review and project monitoring on behalf of the lenders (banks).
3'600 tpd Full engineering responsibility, i.e. feasibility study, engineering, call for tender.
Technical audit.
Validation of the optimization of the cement grinding.
Consulting services for White cement plant.
Power Plant 30/40 MW Full engineering responsibility, i.e. feasibility study, engineering, call for tender, contract, erection and commissioning supervision.
5'000 tpd Feasibility study and engineering for a green field plant.
3'600 tpd Full engineering responsibility, i.e. feasibility study, engineering, call for tender, contract, erection and commissioning supervision.
Extension packing plant. Full engineering responsibility, i.e. feasibility study, engineering, call for tender, contract, erection and commissioning supervision.
Extension 3’600 tpd. Full engineering responsibility, i.e. feasibility study, engineering, call for tender, contract, erection and commissioning supervision.
Coal Mill department (28 t/h). Full engineering responsibility, i.e. feasibility study, engineering, call for tender, contract, erection and commissioning supervision.
2001-2005 Ciments du Sahel Sénégal
Cement plant 600'000 tpy
2004 Central Asia Cement Kazakhstan
Revamping
2004 Hope Cement United Kingdom
Indirect Firing System extension
2004 Abco S.A. Dominican Republic
Cement grinding plant
2001 Asment Ouled Zidane Morocco
Design study
2000 Amran Cement Plant Yémen
Extension study (1 Mio tpy)
1996 Diamou Cement Plant
Cement plant 45'000 tpy (expertise)
1996-1999 Oman Cement Company Oman (Muscat)
Cement plant extension
1995 APC 1.4 MTY Philippines
1.4 mio tpy cement plant
1995-1998 Bosowa Indonesia
1.5 mio tpy cement plant
1995 Maple Leaf Pakistan
Cement Plant 1 Mio tpy
1995 D.G. Khan Cement Pakistan
Cement Plant 1 Mio tpy
1994 Kuwait Cement Co. Kuwait
5'500 tpd of clinker
1994 Khursaniyah/Eastern Province Cement Saudi Arabia
2x1 mio tpy cement plant
1994 Adra Cement Syria
Cement plant extension studies
1994 Fauji Pakistan
Cement plant 1 mio tpy
1994 Bizerte Cement Tunisia
Relocation of Primary crusher
1993-1995 Gaborone Botswana
Cement grinding plant 400'000 tpy
1993 Hama Syria
Cement plant 1 mio tpy
1993-1997 Republic Cement Corporation Philippines
Cement Plant 1 mio tpy
1990-1993 Mafraq Plant Yemen
Erection supervision & commissioning
1989-1992 Cigu Cement Guyane Française
Cement grinding plant 600'000 tpy
1985 Hetauda Cement ind. Ltd. Nepal
Cement plant 250'000 tpy
1984-1987 SKC Saudi Kuwaiti Cement Kuwaït
Cement plant 2.4 mio tpy
1978G.N.O.I. Lybia
Concrete bloc plant, 5.6 mio tpy
1978 G.N.O.I. Libye Cimenterie Lybia
Cement Plant 1 mio tpy
1978 SNMC Beni Saf Algeria
Cement plant 500’000 tpy
1978 S.N.M.C. Zahana Algeria
Cement plant 500’000 tpy conversion
1977 Ciments de Gabès Tunisia
Cement plant 700'000 tpy
1976 S.N.M.C. Zahana Algeria
Cement plant 1mio tpy